Commitments to Project
| Description | Status | Date |
| Bill of materials to Preparation crew | Lou & Stu DONE | Wednesday, May 23th, 2007 |
| Pre-fab sandwich panels. | Stu, DONE | Saturday, May 26th by Noon |
| Pre-fab framing: clerestory wall. | Greg, Bill, Lou, Neil, Eleanor, DONE | Saturday, May 26th by Noon |
| Erect clerestory and roof framing. | Lou, Neil, Eleanor, Amy, Michael DONE | Saturday, May 26th |
| OSB sheathing over roof, eaves, facia | Lou, Neil, Eleanor, DONE | Saturday, May 26th |
| Siding paper on exterior walls | Betsy, Richard, PARTIAL | Saturday, May 26th |
| Store 4 sheets dry wall above existing rafters | Tim Swift, DONE | Monday, May 28th |
| T1-11 siding on exterior walls | Neil, Stu and Tim Swift, PARTIAL | Monday, May 28th |
| Lay roofing paper and asphalt shingles | Assigned: Eleanor & Steve | Wednesday, May 30th |
Crew Members
| Job | Person | Responsibilities |
| Crew Chief | Stu Anderson | Coordinate crew. Plan tasks. Arrange for tools and material. |
| Architect | Greg Brown | Aesthetic guidance and design details. |
| Carpenter | Neil Lynch | Skilled framing, roofing, siding. Bring carpentry tools. |
| Carpenter | Lou Gutierrez | Skilled framing, roofing, siding. Bring carpentry tools. |
| Carpenter | Adam Birnbaum | Skilled framing, roofing, siding. Bring carpentry tools. |
| Apprentice | Bill Paxton | Framing, roofing, siding. Bring carpentry tools. |
| Builder | Eleanor Batho | Framing, roofing, siding paper, shingles. |
| Builder | Michael Parr | noon~3pm Framing. |
| Builder | Amy Wright | Framing. |
| Builder | Betsy Gilpin | Buy dry wall, serve lunch, siding paper, . |
| Builder | Richard Anderson | Siding paper. |
| Builder | Tim Swift | Framing, Siding, waterproofing. |
| Builder | Steve Bartram | Roofing paper, shingles. |
Tools & Material
| Item | Source | Material Description | Qty & Units | Cost |
| 1 | Dixieline | Lumber, drywall, fasteners, insulation | QTY_@_UNIT | $1200 |
| # | Dixieline | WindowMaster 800 series, 4'x2' almond vinyl fixed dual E-glazed | 2 @ $117.55 | $235 |
| # | Dixieline | Ventilator fan, 180 CFM, N505 | 1 @ $60 | $60 |
| # | Dixieline | Kool Seal White Elastomeric roof coating | 1gal | $20 |
| # | Dixieline | DESCRIPTION | QTY_@_UNIT | $LINE |
| # | Dixieline | DESCRIPTION | QTY_@_UNIT | $LINE |
| # | Dixieline | DESCRIPTION | QTY_@_UNIT | $LINE |
| # | Home Depot | Various | QTY_@_UNIT | $LINE |
| # | Home Depot | Asphalt shingles, white, 3-tab 33 sqft pkg | 6pkg @ $15 | $90 |
| # | Home Depot | 8' 2"x4" studs | 6 @ $2.30 | $15 |
| # | Home Depot | Jiffy Seal 6" x 50' roll | 1 @ $20 | $20 |
| # | Home Depot | DESCRIPTION | QTY_@_UNIT | $200 |
| # | Home Depot | DESCRIPTION | QTY_@_UNIT | $200 |
| # | Home Depot | DESCRIPTION | QTY_@_UNIT | $200 |
| ---- | Buyer: | BUYER_NAME | BOM Total: | $SUM |
Todo List
- Specify, order windows
- Revisit Dixieline order: waterproofing, shingles, drywall
- Cut A/C and window holes, add wire mesh until windows arrive???
- East wall T1-11 siding
- Block, nail down new sill, install T1-11 siding ties to extant beam
- Block bottom of West wall
- Apply waterproofing on Clerestory & West wall
- West wall T1-11 siding
- Install windows, flashing, paper, siding
- Apply roofing paper
- Install shingles
- !! NOTIFY BENTON Roofing of nail hole in foam roof.
- ITEM
Action Items
| Item | Done | Description | Who | When |
| 1 | DONE | Specify 4'x2' windows from Window Master / Dixieline | Greg Brown | Tuesday, May 29 |
| 2 | ? | Buy: waterproofing, insulation, shingles, drywall | Stu | Wednesday, May 30th |
| 3 | ? | Install Roofing paper and shingles | Eleanor & Steve | Wednesday, May 30th |
| 4 | ? | Bring roof patching tools: roller, scraper, steel brush, bleach | Stu | Wednesday, May 30th |
| # | ? | DESCRIPTION | WHO | WHEN |