This list identifies and tracks the status of active Project Plans. Project Summaries created in UUBG-065 Projects: Master Index are expanded into Project Plans here, with an initial STATUS of [TODO]. Project Plans remain here while they are active with one of these STATUS conditions:
- [TODO] - Awaiting planner(s)
- [ASSESS] - Assess the needs
- [PLAN] - Address the needs
- [DESIGN] - Detailed design and plan
- [EXECUTE] - Implement the plan
- [FOLLOWUP] - Loose ends remaining
When a project reaches its final STATUS (which may be: [DONE], [MAINT] or [QUIT]) it is moved to UUBG-067 Projects: DONE List. Project Plans are listed under the working group responsible, newest projects first. See UUBG-068 Projects: User's Guide for details.
These are active projects for the Buildings & Grounds Committee which is comprised of a steering committee and four working groups, as described in UUBG-035 Organization: UUFSD B&G Committee.
These are active projects for the Steering Committee whose ongoing responsibilities are described in UUBG-036 Organization: Steering Committee and UUBG-043 Tasks: Steering Maintenance. Listed in descending ProjectID order (newest project first).
| ProjectID InDate (DueDate) UpDate [STATUS] |
Project Document Title (Source)
Description Related Projects & Tasks Next & Needs Notes |
| PID-072
2008-02-03 () 2008-04-09 [TODO] |
Health and Safety (Anne Larocca, Alison Crotty)
Anne Larocca: Magda Heath who is 90+ years old and is having trouble getting from the upper parking lot down to the library. She suggests improving the walkway from upper parking lot to office and beyond to Library. I’m not sure if she means the surface is uneven or if she’d like handrails, or both. Alison Crotty: Do we have tons of rattlesnakes on site, as one expert suggests?
|
| PID-063
2008-03-10 () 2008-04-06 [ASSESS] |
Document Site & Facilities (Stu Anderson)
Project to document UUFSD's physical site and facilities. Catalog existing and create new drawings and documents as needed. Include: structural; mechanical; electrical wiring & breaker panels; water & gas plumbing, meters & shutoffs; irrigation; telecomm networks - phone, computer, video. Make these readily accessible. Related Projects & Tasks
|
| PID-024
2007-08-01 () 2008-04-06 [PLAN] |
Green Sanctuary (Marie Grady)
Cooperate with efforts of the Green Sanctuary committee. Related Projects & Tasks
|
| PID-021
2007-07-01 () 2008-04-06 [TODO] |
Energy Audit (Greg Brown)
Look at energy usage throughout the site. Look for opportunities to reduce. Notes
|
| PID-018
2007-07-01 () 2008-04-06 [TODO] |
Write Policies & Procedures (Stu Anderson)
Write a set of Policies & Procedures for the Buildings & Grounds committee. Notes
|
| PID-017
2007-07-01 () 2008-04-06 [TODO] |
Create Site Map (Stu Anderson)
Web-page map of buildings and grounds with hyper-links to relevant UUBG documents. |
| PID-015
2007-07-01 () 2008-04-06 [EXECUTE] |
Carefully Combat Vermin (Marie Grady)
Eliminate ants, rodents and other vermin from inside UUFSD buildings with a minimum of poisons. Instead seal them out and minimize their habitat and food sources. Related Projects & Tasks |
These are active projects for the Landscape Group whose ongoing responsibilities are described in UUBG-037 Organization: Landscape Group and UUBG-044 Tasks: Landscape Maintenance. Listed in descending ProjectID order (newest project first).
| ProjectID InDate (DueDate) UpDate [STATUS] |
Project Document Title (Source)
Description Related Projects & Tasks Next & Needs Notes |
| PID-078
2008-05-25 () 2008-05-26 [TODO] |
Encourage Native Plants (Anne Larocca)
Use native plants to displace weeds throughout the site, one patch at a time: 1) Clear non-native weeds from the patch. 2) Select and plant appropriate natives for the area. 3) Weed and water "religiously" for 1~2 yrs. 4) Start next patch. Related Projects & Tasks
|
| PID-077
2008-05-14 () 2008-05-14 [MAINT] |
Maintain Healthy Trees (Stu Anderson)
There are many trees of all sizes throughout the site. They are threatened by drought, pests and old age. Inspect annually, trim, irrigate, plant replacements as needed. Related Projects & Tasks Next & Needs
|
| PID-058
2007-12-01 () 2008-04-06 [TODO] |
Irrigation Plan (Greg Brown)
Document existing irrigation plumbing over site. List controlled and manual valves. Design a plan to automate irrigation. Related Projects & Tasks
|
| PID-019
2007-07-01 () 2008-04-06 [TODO] |
Manage Underbrush (Betsy Gilpin)
Reduce habitat for vermin. Reduce risk of wildfires. Related Projects & Tasks
|
| PID-012
2007-07-01 () 2008-04-06 [EXECUTE] |
Organize YRUU Closets (Stu Anderson)
There are a couple of exterior closets on the east end of the YRUU building which contain lots of landscape supplies, hose and irrigation fittings, etc. Organize these. Related Projects & Tasks
|
These are active projects for the Hardscape Group whose ongoing responsibilities are described in UUBG-038 Organization: Hardscape Group and UUBG-045 Tasks: Hardscape Maintenance. Listed in descending ProjectID order (newest project first).
| ProjectID InDate (DueDate) UpDate [STATUS] |
Project Document Title (Source)
Description Related Projects & Tasks Next & Needs Notes |
| PID-074
2008-04-13 () 2008-04-14 [PLAN] |
Project: Resurface DG Parking Lot (Stu Anderson)
Lower parking lot is decomposed granite. Erosion has become severe. Need to add more material and grade. Related Projects & Tasks |
| PID-009
2007-05-01 () 2008-04-06 [PLAN] |
Formalize Path to Memorial Wall (Stu Anderson)
Formalize this path from lower parking lot to the path leading to the amphitheater (shortcut past the long bridge). Related Projects & Tasks |
| PID-008
2007-05-01 () 2008-04-06 [PLAN] |
Formalize Path to Montessori (Stu Anderson)
There are two paths between UUFSD's lower parking lot and the Sante Fe Montessori school yard. The established path is long and gently sloped, the newer is a shortcut up an embankment to the parking lot. We propose to formalize the shortcut by building a set of steps up the bank and informalize the longer path as part of a hiking trail. Related Projects & Tasks
|
These are active projects for the Structures Group whose ongoing responsibilities are described in UUBG-039 Organization: Structures Group and UUBG-046 Tasks: Structures Maintenance. Listed in descending ProjectID order (newest project first).
| ProjectID InDate (DueDate) UpDate [STATUS] |
Project Document Title (Source)
Description Related Projects & Tasks Next & Needs Notes |
| PID-076
2008-05-14 (Inspect ANNUALLY) 2008-05-14 [MAINT] |
Paint Exteriors of Wooden Buildings (Stu Anderson)
The original generation of wooden buildings are all painted the same beige color. They all need to be repainted every few years. Related Projects & Tasks
|
| PID-075
2008-05-13 () 2008-05-14 [TODO] |
Repair Locks & Organize Keys (Patricia Weld)
Repair door locks, organize keys, make duplicates as needed. Related Projects & Tasks Next & Needs
|
| PID-071
2008-04-09 () 2008-05-13 [TODO] |
Maintain Roofs of Wood Buildings (Patricia Weld)
Patricia reports: North County Roofing replaced one classroom roof in September 2003 and the other two in February of 2005. These flat torch-down roofs are guaranteed for five years. Unfortunately, the paperwork does not specify which classrooms were repaired when. Greg Brown, and Miles Anderson were involved and may remember these details.
|
| PID-061
2007-09-14 () 2007-12-16 [EXECUTE] |
Electrical Breaker Maps (Stu Anderson)
Map the physical locations of outlets against their controlling breakers. This information should be available for all buildings. Replace illegible breaker schedules on boxes. Related Projects & Tasks
|
| PID-031
2007-09-01 () 2008-04-06 [TODO] |
Paint Founders' Hall Exterior (Stu Anderson)
During PID-029 Bees at Founders' Hall it became clear that Founders' Hall exterior woodwork needs repainting and that it is a job for professionals with scaffolds. Palmer Library may be similar. Put it out to bid. Complete sealing out bees when scaffolds are up? Related Projects & Tasks
|
| PID-030
2008-01-01 () 2008-04-06 [TODO] |
Repaint Bridges to Amphitheater (John Gillies)
Many planks are worn down to bare wood. Sand, prime, repaint. |
| PID-023
2007-07-01 () 2008-04-06 [TODO] |
New Administration Building (UUFSD Board)
Build new administration building in place of YRUU building or between the playground and the Palmer Library. Notes
|
| PID-022
2007-07-01 () 2008-04-06 [TODO] |
Permanent Sunshade (UUFSD Board)
Replace umbrellas at amphitheater with a permanent shade structure. Notes
|
| PID-014
2007-07-01 () 2008-04-06 [ASSESS] |
Repair Leaking Kithen Roof (Rev. Jim Grant)
When it rains hard water gets into the kitchen. There is a musty smell in the Nursery. Related Projects & Tasks |
These are active projects for the Furnishings Group whose ongoing responsibilities are described in UUBG-040 Organization: Furnishings Group and UUBG-047 Tasks: Furnishings Maintenance. Listed in descending ProjectID order (newest project first).
| ProjectID InDate (DueDate) UpDate [STATUS] |
Project Document Title (Source)
Description Related Projects & Tasks Next & Needs Notes |
| PID-073
2008-03-01 () 2008-04-09 [TODO] |
Storage Shelves & Cabinets (Patricia Weld)
Address various storage needs throughout the site. Patricia needs room for more Banker's Boxes to store annual financial records. Currently there are 9 boxes in the office supply closet + 10 in Palmer Library Mens' restroom closet. She proposes we put cabinets up on the rear wall of the office under the new roof (above the gravel). Bankers' box is 16"x11"x12". Such a cabinet could be 12' long by 3' high and hold 2 rows of 10 boxes = 20 boxes. Related Projects & Tasks |
| PID-033
2007-08-30 () 2007-08-30 [TODO] |
Repaint Amphitheater Benches (Niel Lynch)
Repaint or restain all the benches in the amphitheater. Related Projects & Tasks
|
| PID-020
2007-07-01 () 2008-04-06 [TODO] |
Update Signage (Rev. Jim Grant)
Hand-painted wooden signs are in use throughout the site and to mark special parking spaces. Many of these are outdated or termite ridden. Notes
|